
When you build a spec home you are creating an asset that will be sold to another person.
Spec homes are built in anticipation of a sale; therefore, a construction contract does not exist. You do not use the rules for home construction contracts, which are contracts to build a home with four or fewer residential units.
When you build a spec home all the direct and indirect costs are accumulated.
These costs are called the basis of the property and cannot be deducted until the home is sold. The costs that must be included in the basis of the home are:
- Land
- Materials
- Labor, and
- Allocated indirect costs (See table of indirect costs)
Thus, the income is reported and the basis deducted in the year the home is sold.


Every day I find stories online exemplifying the challenges that our industry and fellow home builders face, and because I look for it…
A Featured SpecHomes.com listing will appear in some of the most prominent sections of the site as well as appearing highlighted in our inventory home search results. Your featured listing will get premium visibility and increase the audience for your ready to move spec homes. The more prospects that see your inventory homes, the better chance you have of finding a buyer.
However, the costs to obtain an unsecured loan are usually lower. And the relative ease of getting this type of loan makes it popular for small projects costing $10,000 or less.
Until recently, buying was the social norm; ”having stuff, having name brand stuff, having the new, the bigger, the more,” said George Barany, director of financial education for America Saves, a Washington-based educational nonprofit.
Here’s how to get that new home loan:


According to Nicholas, these include: